LESS WORKING OUT. MORE GETTING ON.
Fence planner.
Your measurements. Your materials. All worked out.
Measure your fence
METRESAdd each straight stretch separately. Leave gate openings out and enter the fence on either side as separate runs.
Choose your build
Material settingsAdjust your usual allowances
2.1 m spacing uses 4.2 m rails. 1.8 m spacing uses 3.6 m rails. Each wall cleat uses half a 3.6 m rail and replaces the starting post and its postcrete. Extra timber applies to boards, rails and capping.
The working out
A closer look at your quantities| Fence run | Length | Spacing | Bays | Post positions* | Boards |
|---|
*Shared posts counted once; starting wall cleats replace a post. Existing usable posts and extra timber are applied to the final materials list.
Rail cutting guide Nominal lengths · offcuts reused
Rails are split at post positions, with the last bay shorter where needed. Suitable offcuts are reused across the job. This guide excludes saw loss, fitting and trimming; check actual timber lengths and add an allowance before ordering. The packing method may not find the absolute minimum.
A practical estimate for planning your order. Boards are calculated per run with no gaps. Capping uses nominal lengths with offcut reuse; check joint positions. Gates, fixings and unusual site conditions need a separate allowance.